Fukushima cleanup to cost $72 billion
Posted by Big Gav in nuclear power
Bloomberg has a report on robots exploring the ruins of the Fukushima reactor complex - Japan Pictures Likely Show Melted Fukushima Fuel for First Time.
Because of the high radioactivity levels inside the reactor, only specially designed robots can probe the unit. And the unprecedented nature of the Fukushima disaster means that Tepco, as the utility is known, is pinning its efforts on technology not yet invented to get the melted fuel out of the reactors.The company aims to decide on the procedure to remove the melted fuel from each unit as soon as this summer. And it will confirm the procedure for the first reactor during the fiscal year ending March 2019, with fuel removal slated to begin in 2021.
Decommissioning the reactors will cost 8 trillion yen ($72 billion), according to an estimate in December from the Ministry of Economy, Trade and Industry. Removing the fuel is one of the most important steps in a cleanup that may take as long as 40 years.